CARPET REPLACEMENT
9075 Square yards at Cline, Bales, Jr. High, and High School
including correction of moisture problem at Jr. High Round Building
(12,000 square feet). Current carpet is worn out and loose, wrinkled.
ROOF REPLACEMENT
136,830 Square feet at Cline(12 years old and damaged), Westwood
(36 years old), Jr. High(25 years old), and Bales (11 years old
but single ply which does not hold up well). Bales includes thru-wall
flashing replacement. Remove Cline skylights.
HVAC EQUIPMENT REPLACEMENT
Includes one boiler, one chiller, eleven air handlers, chill
water, and boiler piping with insulation.
- 4 air handlers in FHS old mall-July 1970, Condition:
pans rusting through, coil housing rusting, coils showing wear.
- 2 air handlers in FHS auditorium-July 1970, Condition:
pans rusting through, coil housing rusting, coils showing wear.
- FJH cafeteria air handler-June 1963, Condition: pans
rusting, interior wall insulation falling off, coil housing rusting
severely.
- 2 air handlers in Jr. High Old Bldg.-February 1969,
pans rusting, interior wall insulation falling off, coil housing
rusting severely.
- FJH auditorium air handler-February 1969, Condition:
pan is rusting, interior wall insulation falling off, coil housing
rusting through, fins deteriorating.
- Westwood Open Area air handler-June 1970, Condition:
coil housing rusting severly at bottom, pan rusting, fins showing
wear.
- Cline Main Boiler-1975, Condition: cracked fire wall,
burner, burner assembly and hot water exchanger rusting. Location
is closet of library office.
- Westwood Roof Chiller-July 1989, Condition: chiller
barrel holding bracket rusting through at frame, condenser coils
have severe corrosion problem, control panel corroding.
FOOD SERVICE EQUIPMENT
Replacements at Westwood and Jr. High include ovens, stoves,
warmers, steamers, grills, walk-in freezers, walk-in coolers,
one serving line, one dishwasher, stainless prep and cleaning
tables.
Westwood's equipment is 37 years old, JH equipment is 42 years
old.
TRACK
Replace High School track with metric track. Current track
has noticeable holes which kept it from hosting UIL track events.
When it is FISD's time to host a track event, the district must
pay another ISD to host the event due to a track not able to
safely host an event. Upgrade P.A. system.
CEILINGS
Install drop ceilings for library, cafeteria, and nineteen
class rooms at Westwood. The current ceilings are spray on cellulose
which is not top quality. New ceiling would have more evenly
distributed lighting and air.
Fire Alarm Upgrades at Cline, WW, JH, and HS
Jr. High and High School currently have mixed systems, old
with new. Upgrades would be to install addressable detectors
and move all old areas at these two schools to the newer panels.
Cline and Westwood will need new panels. Additional pull stations
and A/V's to meet code. Meets current codes (grandfathered) as
long as major renovation is not done to building. Components
have to be repaired, Replacement parts not available.
Close in walls, renovate HVAC system at Cline
Includes walls and doors for 38 class rooms, thermostats,
damper controls, and variable drives for air handlers. Principals
have requested need for noise control with faculty complaints
that the open area is too noisy for teaching. Multiple complaints
for hot and cold areas. (Walls put in previously have disrupted
HVAC original design from 1980.)
District wide site work, sidewalks, parking, and drainage
Includes replacement of sunken or elevated sidewalks, concrete
parking repairs, drainage of standing water. Would eliminate
trip hazards. Deteriorating concrete, drainage swells
that are filling in, and standing water around buildings.
District phone system upgrades
Cline can not dial in or receive incoming calls to classrooms,
no voice messaging. Bales does not have voicemail capabilities
or night mode. High School is a mix of old and new systems, most
teachers cannot call out from their rooms. Would supply equity
in communications of teachers district wide.
High School Main Building water line replacement
Replace old schedule 20 PVC with copper piping. Old PVC is
very susceptible to cracking, has already caused one major flood
and a couple of smaller ones. Never know when the next water
line break will be, especially those that happen after hours.
Auditorium catwalk for stage light adjustments.
Catwalk at ceiling that allows for safe adjustment to lights.
Does not include fly space for sets. This is a safety issue for
students.
Convert football field to multipurpose field
Consists of new artificial surface and drainage. The field
is currently used by football players. Other sports and extracurricular
groups (band, for example) cannot use the field due to detrimental
effects to the natural landscaping. A multipurpose field would
allow multi-usage throughout the year.
Stadium storage/ locker room for track/ soccer
Includes demolition of old visitor's side concession and
erection of one 55 x 45 metal building with brick veneer. Building
includes lockers and showers for soccer and track teams, and
could be used as visitors locker room. Storage would house all
track and soccer equipment that is currently in shipping containers
Two School Buses
|